Luxury condo renovation contractor in South Beach.
Full-unit renovations inside South Beach and Miami Beach condominiums, led by the owner. Rated 5.0 on Google.
Completed kitchen and living area, Continuum South Tower, South Beach
Home / Service areas / South Beach luxury condo renovation
Ballagas Construction is a luxury condo renovation contractor in South Beach: an owner-led Florida State Certified General Contractor (CGC1530999) delivering full-unit renovations, kitchens, baths, closets and custom millwork inside Miami Beach condominiums. We prepare the association approval package and work within association rules and City of Miami Beach permitting, including the association authorization letter, certificates of insurance, elevator reservations and building work hours.
Florida State Certified General Contractor CGC1530999 · Licensed & Insured · Owner-led · Google rating 5.0 from 13 reviews · Read our Google reviews (opens in a new tab)
Renovating a condo in South Beach.
South Beach is the southern end of Miami Beach, from South Pointe up through the Art Deco district. Its condominiums range from Art Deco and mid-century buildings to towers along the water, and almost every renovation here happens inside a building that other people live in. A luxury renovation is two projects at once: the unit, and the building around it.
Ocean-facing units add their own demands: salt air and humidity, large expanses of glass, and finishes such as large-format stone, marble, integrated lighting and custom millwork that must be planned long before they arrive. We plan substrates, rough-ins and sequencing around those details well before the finishes arrive.
What we renovate in South Beach condos.
- Full-unit condo renovations
- Kitchens with stone islands and custom cabinetry
- Primary suites and marble baths with freestanding tubs
- Walk-in closets and dressing rooms with custom millwork
- Powder rooms with feature stone walls, including onyx
- Living areas and bedrooms with integrated lighting and media millwork
- Association approval packages prepared for your building
- Demolition coordinated with building management
- Freight elevator and delivery coordination
Association approval, city permits and building rules.
For most work inside a unit, the City of Miami Beach Building Department requires an authorization letter from the condominium association. The letter goes on association letterhead and is signed by an officer or director of the association and notarized. Interior flooring, emergency repairs and exact air-conditioning changeouts are exempt. For a non-structural condominium interior alteration, the city asks for digitally signed and sealed drawings, reviewed by the building trades and the Fire department, and it may also ask for a soundproofing specification, a waterproofing specification and, for demolition, an asbestos survey. Some projects need Planning Board approval before the building permit can be submitted.
Inspections can include framing, sound proofing or underlayment, drywall, insulation, fire safety and a building final; not every inspection applies to every job. The association adds its own rules on top: working hours and noise, certificates of insurance, elevator and loading reservations, and protection of corridors and common areas. The city also limits construction noise by zone, generally to daytime hours and none on Sundays and holidays, and buildings are often stricter. We confirm the current city and building requirements before work is scheduled, and we build approvals, permit review and elevator logistics into the schedule from the start.
What we plan around in a South Beach building.
- Association approval package and building rules
- Workers’ compensation and certificates of insurance naming the building
- Freight elevator, loading and deliveries
- Work hours, noise and sound control
- Waterproofing for wet areas
- Protection of corridors, elevators and neighboring units
Our five-step process.
Plan Review
Architectural, structural, civil, MEP, specifications, missing details and field constraints.
Scope Definition
Line-item scopes, inclusions, exclusions, allowances, alternates and owner decisions.
Budget & VE
Subcontractor pricing, quantity checks, constructability input and value engineering where useful.
Schedule Strategy
Permitting and design review, procurement, inspections, sequencing, long-lead items and site logistics.
Field Execution
Mobilization through turnover, with weekly updates (photos, schedule notes, decisions needed) and written, priced change orders approved before work proceeds.
No casual field promises. No vague extras. The change is described, priced, reviewed, approved, and then executed.
A full condo renovation at Continuum South Tower.
A completed full renovation of a residence at Continuum South Tower in South Beach by Ballagas Construction. The job took nine months. The scope covered the kitchen, living area, bedrooms, powder room, closet and primary bath:
- A kitchen with a long stone island and light wood cabinetry
- A living area opening to an ocean-facing window wall
- Bedrooms with new millwork, including a floating wood media wall
- A powder room with a backlit onyx wall
- A dressing room and closet with light wood wardrobes and mirrored doors
- A primary bath with marble walls and a freestanding tub




Stills from the demolition video above.
Completed





Photographs of the completed residence.
How the job ran inside Continuum South Tower.
The building set its own requirements for the work. On this job:
- The freight elevator was scheduled in advance.
- Demolition was coordinated with building management.
- Material deliveries were coordinated with management, so they were received and brought straight up to the unit.
- Work followed the management schedule, 7:30 a.m. to 4:00 p.m.
- Workers’ compensation coverage and certificates of insurance were updated to name the management office and the building.
These are this building’s requirements. Every building sets its own, so we ask for the renovation rules before we plan the schedule.
More views of the completed condo.
A bedroom and the walk-in closet looking through to the primary bath. See more completed work on our projects page. For Miami Beach houses and the wider area, see our Miami Beach condo and home renovation page, and for buildings elsewhere in the city, our Miami condo renovation page.


Frequently asked questions
Who is a luxury condo renovation contractor in South Beach?
Ballagas Construction is a luxury condo renovation contractor in South Beach: an owner-led Florida State Certified General Contractor (CGC1530999) that delivers full-unit renovations, kitchens, baths, closets and custom millwork inside Miami Beach condominiums, and works within association rules and City of Miami Beach permitting.
Do I need association approval to renovate a South Beach condo?
For most work inside a unit, yes. The City of Miami Beach Building Department requires an authorization letter from the condominium association, on association letterhead, signed by an officer or director and notarized. Interior flooring, emergency repairs and exact air-conditioning changeouts are exempt. Many associations also run their own approval process, with their own forms, insurance requirements and contractor rules, so we ask for the building’s renovation rules before we plan the schedule.
Can you prepare the association approval package?
Yes. We prepare the association approval package your building requires. The contents vary by building, so we start from the building’s renovation rules and ask what management needs before we plan the schedule. On our Continuum South Tower job, we updated our workers’ compensation coverage and certificates of insurance to name the management office and the building.
What does the City of Miami Beach require to permit a condo interior renovation?
For a non-structural interior alteration, the city asks for digitally signed and sealed architectural drawings, plus electrical, mechanical, plumbing, fire protection and life safety plans where they apply. Supporting documents can include a soundproofing specification, a waterproofing specification and, for demolition, an asbestos survey. Plans are reviewed by the building trades and the Fire department, and some projects need Planning Board approval first. Inspections can include framing, sound proofing or underlayment, drywall, insulation, fire safety and a building final. Requirements change, so we confirm the current checklist for every project.
What are the construction hours and noise limits in South Beach?
Two sets of rules apply. The city limits construction noise by zoning district; in residential districts, for example, work is allowed on weekdays from 8:00 a.m. to 6:00 p.m. and on Saturdays from 10:00 a.m. to 4:00 p.m., with none on Sundays and national holidays. Commercial and mixed-use zones have their own hours, so the right set depends on the building’s zoning. The building then sets its own hours, which are often stricter and may confine noisy demolition to certain days. On our Continuum South Tower job, for example, work followed the management schedule of 7:30 a.m. to 4:00 p.m. That is that building’s rule, separate from the city’s hours. We schedule demolition and other loud work inside both sets of limits.
How do the freight elevator, loading and deliveries work?
Most buildings reserve the service elevator and the loading area by appointment and ask for certificates of insurance before anything is carried in. Materials go up and debris comes down the same way, with corridors, elevators and floors protected. On our Continuum South Tower job, the freight elevator was scheduled in advance, and material deliveries were coordinated with management so they were received and brought straight up to the unit. We sequence deliveries of stone, cabinetry and glass around those reservations. The city also suspends construction activity in the public right-of-way during certain holidays and special events, which can affect dumpsters and deliveries, so we plan around that calendar.
How do you handle waterproofing and sound between units?
In a condominium, a bathroom floor is also someone else’s ceiling. The city’s checklist can call for a waterproofing specification and a soundproofing specification, with a separate flooring permit and a sound proofing or underlayment inspection. We plan substrates, waterproofing at wet areas and underlayment before tile or stone is ordered, and we check them against the building’s rules.
Can I stay in my unit during a full renovation?
A renovation of every room generally means living elsewhere while the work is under way. Smaller scopes can sometimes be phased so that part of the unit stays usable. We plan the sequence with you and the building before work starts.
How long does a South Beach condo renovation take?
Our Continuum South Tower renovation took nine months. Every job differs with its scope, the building’s rules and permit review. Association approval and the city permit come first, and we set the schedule after we review the drawings and the building’s requirements. We build approvals, permit review and elevator logistics into the schedule from the start.
Have you renovated a condo in South Beach?
Yes. Our completed work includes a full renovation of a residence at Continuum South Tower in South Beach: the kitchen, living area, bedrooms, a powder room with an onyx wall, a closet and a marble primary bath with a freestanding tub. The job took nine months. Our renovation work also draws on more than 85 home additions completed.
Do you also work on houses and new homes in Miami Beach?
Yes. We renovate and expand Miami Beach houses and build new custom homes and teardown rebuilds, coordinating flood elevation and design review with your architect. See our Miami Beach condo and home renovation page.
Are you licensed and insured?
Yes. Florida State Certified General Contractor CGC1530999, licensed and insured.
Tell us about your project.
Send drawings, the building’s renovation rules or a few photos. We reply within 12 hours.
Ballagas Construction LLC
Miami, FL 33131
(786) 909-1601
contact@ballagasconstruction.com
Florida State Certified General Contractor CGC1530999
Licensed & Insured